Physical Progress of Water Conservation and Rainwater Harvesting Structures Completed under Jal Shakti Abhiyan-Catch the Rain (JSA-CTR) in Banswara District of Rajasthan (As on 29.03.2022 to 25.07.2022) | |||||||
District | Check Dam | Pond / Tank | Trench | Rooftop Water Harvesting Structure | Other Rain Water Recharge Structures | Other Water Conservation Structure | Total |
Banswara | |||||||
Rajasthan |